Measure D - Series C

Project Planned expenditures

Project Planned expenditures

PGUSD issues Series C of the 4 part Measure D in 2024.  Thhis Series authorized PGUSD $8.75 million for projects assoctaied with Measure D, Series C Reprioritization List.

Generally, Series C Projects include:
  • HVAC Mechanical upgrades as sites
    • Districtwide focus on energy efficiency projects such as building envelope modifications, lighting (interior and exterior retrofit to LED), stadium lighting retrofit, plumbing and sewer projects.
    • Building Envelopes
    • Playground updates with adaptive equiptment
    • Playground blacktop areas sealing, stripping and ADA
 
Summer 2025 Projects Include:

Robert H. Down Elementary School
  • Removal of modular building
  • Chair Lift Repairs in Ottertorium
  • Roof Coating - Main Building and A-Wing
  • Replacement of Kinder play structure and Swings (to include adaptive equiptment)
  • Stage curtain replacement
  • BASRP flooring and modernization of 2nd half
 
Forest Grove Elementary School
  • Replacement of Kinder play structure and Swings (to include adaptive equiptment)
  • Flooring in Room F2
Pacific Grove High School
  • Gas Leak Detection Survey
  • Gym Electrical
  • Water leak repair
  • Campus electrical switchgear upgrade
 
Pacific Grove Middle School
  • Roof coating & gutter replacement Bldg A&B
  • Playground structure repairs
  • Otis Elevator repairs, service and testing

    David Avenue School Campus
  • Exterior painting and dry rot removal
  • Gutters
  • Restroom Modernization
  • General landscaping 
 
All Sites will have tree removal and/or safety pruning
 
2025-2026 Project Plan of Priorities - TBD